Prefabricated Mining Camp

Technical Information
  • Customer Managem Manub Mining
  • Building Model Prefabricated + All Civil Works
  • Qty 2 150 Rooms
  • Total of Space 4000m²
  • Project YearHaziran 2020
  • Day Of Work 6 Months
  • Location Abu Hamad, Gabgaba
General Information

We completed the 4000m² prefabricated camp project for Manub Mining in Abu Hamad, Gabgaba region in a short time like 6 months.


There is a 150-room structure in the Prefabricated Camping area.

Contact Us
Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam.
Contact Us